Demolition of an existing rooftop terrace Installed new terrace, double in size, with new pedestal pavers and stainless steel railings with glass Furnished and installed a new restroom Created new terrace lobby entrance and installed new elevator doors
Occupied renovation of amenity space in an office building Space includes offices, break room, shared office space, training rooms with operable partition, large conference room, self-serve vending area, and peaked booth nooks Unique finishes include specialty woodworks ceilings, specialty wallpaper, back painted glass, floating bar top, and sealed concrete floors The project required special coordination… Read More
Rooftop lounge creates an area where building occupants can escape their offices and enjoy the views of downtown DC Structural glass canopy was installed to provide open-air seating with sun protection Stone pavers were rearranged to provide a pattern that fit the new outdoor seating layout
Modern amenity area with an open ceiling concept State-of-the-art conference center Pantry with seating areas that can be utilized for lunch or small meetings Fitness Center with locker rooms
Multi-Phased Project Retrofit of existing parking garage into new Fitness and Conference Center Extensive waterproof application, specially designed HVAC system, rigid insulation, addition of windows were a few of the necessities to convert part of the existing parking garage into a usable office space
Complete building repositioning project including exterior finishes, conference room, lobby, hive area, fitness center, and locker room Features include exposed ceilings, polished concrete floors, and natural wood accents Fitness center with the state of the art equipment, locker rooms, restrooms and showers
New tenant lounge and common area Cutting edge design and material selections Upgraded lobby finishes Full building restroom renovation to include new finishes Tied together the outside patio with the tenant lounge
Goal of renovation was to reposition the building in the Arlington, Virginia Real Estate Market Complete renovation of main lobby, exterior entrance, and common area restrooms throughout the building Renovation was completed in 9 months