- Hybrid workspace center that offers flexible and affordable choices of private offices, open co-working areas, conference rooms, and comfortable furnished lounge areas
- All glass entry, sliding glass conference room doors, reclaimed barnwood, and innovative lighting system
- Space was designed to take full advantage of all available natural light
- Several offices built around the outside window perimeter of the building were created with full height glass partitions to maximize the light brought in
- Inside core of the space was designed to be open and consisted of lightly contrasted furniture
- High-end finishes included open ceilings, glass transoms, glass conference room, spiral duct, specialty light fixtures and floating acoustical ceilings
- Design utilized concrete flooring in open areas and carpet in the offices
- Project consisted of 5 phases while space was 100% occupied
- High-end finishes with state-of-the-art equipment and furnishings
- Complete renovation of all customer areas, corporate offices, high tech video conference rooms, restrooms, fitness center, kitchen and break areas
- Warehouse modifications including research and development lab areas
- Upgraded the lobby with high-end finishes such as stain grade millwork wall panels, long plank floor tiles, and a matching, tile covered accent wall with new light fixtures and mechanical diffusers
- Once the lobby was completed, Exxon Mobil renovated their suite entrance along with several other locations within their suite
- High-end technology inspired workspace
- Details such as stained concrete flooring, painted open ceilings, and curved walls throughout made the space truly a unique design
- The reception and display area had a great deal of coordination with the finishes coming together
- Goal of renovation was to reposition the building in the Arlington, Virginia Real Estate Market
- Complete renovation of main lobby, exterior entrance, and common area restrooms throughout the building
- Renovation was completed in 9 months
- Complete rebuild of the corridors and elevator lobby
- Updated finishes throughout
- Work was completed while the space was fully occupied
- Phased renovation of 18 restrooms in a government, secured property
- Included the complete demolition of existing restrooms, and the installation of new, high-end finishes, light fixtures, plumbing fixtures, toilet partitions and accessories
- Designed to have all highly automated, hands free units to allow for a clean and sterile atmosphere
- Occupied, four-phase office expansion and renovation
- Custom millwork in reception area and main corridor
- Paint and carpet throughout