Army Navy Club Building

Multiple projects including Lobbies, Restrooms, Conference Room, Spec Suites, Amenity Space and Penthouse Unique, high-end amenity space drawing inspiration from boutique hotel design New statement staircase built between floors to connect the amenity space to the penthouse

1625 Eye Street – Rooftop Terrace

Rooftop lounge creates an area where building occupants can escape their offices and enjoy the views of downtown DC Structural glass canopy was installed to provide open-air seating with sun protection Stone pavers were rearranged to provide a pattern that fit the new outdoor seating layout

Argon Plaza

Modern amenity area with an open ceiling concept State-of-the-art conference center Pantry with seating areas that can be utilized for lunch or small meetings Fitness Center with locker rooms

Navy Federal Credit Union (NFCU) – Restrooms

Renovation of restrooms on four floors in a compact timeline Complete demolition of existing restrooms prior to renovation Installation of new, high-end finishes, light fixtures, plumbing fixtures, toilet partitions, and accessories New duct and ventilation system installed

Willard Avenue – Fitness Center

Fitness Center and Locker Room Renovation for office building as a new tenant amenity Wood detail and custom mural create an eye-catching feature wall State-of-the-art fitness equipment Locker Room provides a clean, modern space to be utilized pre- and post-workout

Montgomery Center Lobby

Winner of The Chrysalis Award – 2018 Regional Best Commercial Remodel Off-hours renovation of an existing plaza-level lobby that remained operational throughout construction Upgrades include sleek stone and ceramic finishes, a 16’ feature wall with back-painted glass and acrylic panels, and a floating millwork ceiling All new lighting installed throughout featuring 17’ high tiered ceilings… Read More

1100 17th Street

Complete building repositioning project  including exterior finishes, conference room, lobby, hive area, fitness center, and locker room Features include exposed ceilings, polished concrete floors, and natural wood accents Fitness center with the state of the art equipment, locker rooms, restrooms and showers

TMC II

New tenant lounge and common area Cutting edge design and material selections Upgraded lobby finishes Full building restroom renovation to include new finishes Tied together the outside patio with the tenant lounge

One Flint Hill

Complete demolition and re-build of the main building entrance, rear lobby, common areas and restrooms Maintained a safe environment for existing tenants using the facility during construction Great design, well executed for a bright and inviting entrance to the building

Exxon Mobil Lobby

Upgraded the lobby with high-end finishes such as stain grade millwork wall panels, long plank floor tiles, and a matching, tile covered accent wall with new light fixtures and mechanical diffusers Once the lobby was completed, Exxon Mobil renovated their suite entrance along with several other locations within their suite